Due to the enforcement rights from the EA that requires all off mains drainage systems to be upgraded to fall in line with the general binding rules (https://www.gov.uk/guidance/general-binding-rules-small-sewage-discharge-to-a-surface-water) we have upgraded an existing septic tank that was failing to a compliant level. On this project we felt a Marsh Ensign Treatment system was fit for purpose. The Installation was conducted inline with the Manufacturers guidelines and BC regulations. Find out more about our installation services here – https://www.belowgroundsolutions.co.uk/drainage-systems/
A review from the customer was also given which makes it all worth while –
“I would also add that your contractors, Below Ground, were very professional and have completed a fantastic job for us, The guys were friendly and kept us acquainted with the progress and any variations that were necessary”
I will certainly recommend you to any of my friends and clients in the event that they suffer a similar situation
New tank in position surrounded by concrete to secure and protect